Skip to Main Content

Showroom, Warehouse and Loading Bay LED Lighting Installation in Oldham

Energy efficient LED lighting from Airis Energy UK helps to reduce the electricity costs of this showroom and warehouse by an estimated £12,457.56 per annum.

Based in Oldham outside Manchester, WeFitAnyFurniture specialise in the art of fitting bespoke fitted furniture. With teams of experienced kitchen and bedroom installers throughout the UK, they have a busy operational warehouse with many orders to fulfil.

Good lighting in such an environment is important from a point of safety and productivity. WeFitAnyFurniture approached Airis with a view to reducing their carbon footprint and improving their work environment.

Annual savings

With more traditional lighting replaced with LED high bays and tubes, significant annual savings were achieved.

84179.32 kWh

71% energy reduction

£12,457.56

Before and After

The following series of before and after photos speak for themselves in terms of results.

With sharply rising energy costs and zero capital expenditure available, now is the right time to consider upgrading your lighting infrastructure.

Contact Us

Call our team to find out how we can help you reduce your carbon footprint on 01253 283050.

Other LED Lighting Case Studies

LED Lighting

New Aircraft Maintenance Hangar Lit with Low Energy LEDs

Bright, clean and crisp LED lighting provides workforce with a great working environment for complex engineering and mechanical work in this new purpose-built aircraft maintenance hangar.

All areas of the hangar are well lit by the LED high bays
LED Lighting

Chiltern Reduce Energy Costs by 70%

LED lighting in their workshop and elsewhere helps precision engineers and manufacturers achieve 79% energy savings.

Chiltern Rail
LED Lighting

Improved LED Lighting Offers Carbon Reduction Savings for Timber Group

Complete refit for first of many National Timber Group sites, offering significant carbon reduction savings from new LED lighting solutions to all areas.

Rembrand Timber Ltd
Testimonial Chiltern Railways, London Marylebone Railway Station

This is fantastic. Well done to everyone especially Andy S, Kathy, Chris, Paul and the Airis team on the ground. You have all worked really hard to get the lights in and I am conscious that you have worked across the Easter weekend to get this done, thank you I appreciate this. There has been minimal disruption to our customers and our teams. Great work really pleased with the results!

Debbie Osbourne, Chiltern Railways, London Marylebone Railway Station
Testimonial Serco

Overall, I am very happy with the service provided by Airis. Any query raised was dealt with immediately, and the engineers were approachable and took pride in their installation. The regular updates were very welcomed and informative and the fact the project was completed ahead of schedule meant we were able to start to see the benefits sooner than planned.

Brendon Lewis, Serco
Testimonial Fairhaven Golf Club, Lytham Saint Annes

Following several recommendations, we engaged with Airis to deliver a solar project here at Fairhaven Golf Club. As an organisation, we prioritise sustainability throughout our working practices and to partner with a company that shared these values was most beneficial to the process. The project will see our annual grid consumption reduce by over 12% resulting in around 21,000 kWh of energy each year being generated. During the planning stages, we encountered several issues which the team at Airis helped to resolve. Their understanding, flexibility and practice applications made the whole process seamless. We could not recommend Airis more highly.

Mark Duncalf, Fairhaven Golf Club, Lytham Saint Annes
Testimonial Cairngorm Capital, London

The change to LED has been a switch we’ve been considering for a few years. It was just a matter of finding the right partner with the expertise to deliver it across all our sites. Airis Energy Solutions not only made it happen, but they upgraded 29 of our sites simultaneously with upfront costs kept to a bare minimum. The results speak for themselves.

John Douglas, Cairngorm Capital, London
Testimonial Archbold Holdings Limited, Leeds

I would highly recommend Airis UK, they have successfully installed lighting to 4 different parts of our business including the yard and parking areas. All their fitters are polite and professional, and they make sure that the areas are left clean and tidy after all installs. Excellent prices and always happy to help. I am unable to comment on how they react to any issues or repairs as we haven't had any.

Amanda North, Archbold Holdings Limited, Leeds
Testimonial Lostock Hall Academy, Preston

To the Airis team. Just to let you know that we’re really happy with the work and the difference in the quality of the lighting. Your guys were a credit to you with their work ethic, getting so much done at night and also over weekends. I am more than happy to recommend your services in the future.

Gary Tiller, Lostock Hall Academy, Preston
Testimonial Fixit-UK, Wigan

From the initial contact with David from the sales team all the way through the process and installation I cannot fault Airis.

The installation team were extremely professional, and nothing was too much trouble. The work undertaken was of first-class quality, the difference to the centre is simply amazing. Although you may think I am going too far here… the lighting type and levels to have lifted the general mood of the whole centre!!

In addition, substantial savings will be made with increased efficiency and the ability to effectively lease purchase benefit avoiding a substantial initial outlay. Fix It UK Ltd is a charity that focuses on helping the most disadvantaged young people of the Wigan Borough through alternative provision education and training. Therefore, cost saving is perhaps even more important, allowing the charity to focus as much funding as possible directly towards our young people.

Airis were absolutely first class from start to finish including the customer care from the administration team!!! I look forward to continuing working with them in the future.

Lee Walls, Fixit-UK, Wigan
Testimonial ISB Group Limited, Birmingham

Extremely helpful at every touch point. Carried out fully on all promises and made the whole experience a pleasure. Installers were very professional and ensured minimal disruption to our operations. A very pleasing result and has achieved the anticipated ongoing cost saving in electricity usage.

Clive Grinnell, ISB Group Limited, Birmingham
Testimonial Hambleton Primary Academy, Over Wyre

We sourced Airis Energy Solutions alongside the Green Business Fund / Carbon Trust to install a full school LED Smart Lighting system. All our lighting was extremely outdated and was failing more frequently, at a significant cost each time. There is no capital outlay and the installation of new lights was a very efficient process, with all the old lighting being taken off-site afterwards. It has significantly improved the appearance around school, has reduced our maintenance costs to zero, reduced our CO2 emissions and will reduce our energy consumption over time.

Hambleton Primary Academy, Over Wyre
Testimonial Parallax Agency

Absolutely delighted with the results and the team who came to do the installation were clearly very experienced. Made my life very easy and disruption to our business was negligible, in fact the only time the power had to go off was because they went the extra mile for me and swapped our sub-meter out. The finished job's tidy, you can barely even tell they've been here!

Lawrence Dudley, Parallax Agency
Testimonial Athertons Carpets, Blackpool

I would be more than happy to recommend the Airis scheme and service. We have had all our lighting replaced with the Airis scheme, with this we have had no outlay or cost to ourselves.We are delighted with the results and would therefore recommend Airis to other businesses like ourselves.

Clark Shaw, Athertons Carpets, Blackpool
Contact Us:

Get in touch

If you wish to talk us directly, you can find our details here. Please note our phones are only answered during standard office hours.

Address:
Unit 2, Peal House, Poulton Industrial Estate, Cocker Avenue, Poulton-le-Fylde, Lancashire, FY6 8JU