Project Impact: Key Metrics
Achieves return on investment within just 21 months
Over 2,000 tonnes of C02e reduction each year
Zero lighting maintenance cost for the next 10 years
Increased shop floor lux levels by 75%
The LED lighting upgrade across our estate was a huge success, financially, operationally, and helped us reduce our carbon footprint contributing to our sustainability goals. The planning was meticulous from both Airis and Matalan to ensure there were no disruption to our store colleagues or a reduced shopping experience for our customers. The collaboration between Airis and the Matalan FM team was truly remarkable to upgrade 127 stores within a nine-month time frame with no technical issues or complaints just shows how hard the teams worked together. – Dan Butler, Senior Facilities Manager, Matalan
I’ve heard very good things re the LED project so just wanted to pass on my thanks to you and your team for all efforts – Julia Hassall, Head of GNFR Procurement, Matalan
We are very satisfied with the works carried out, and also the way in which the contractors worked with such speed, efficiency and professionalism. The store looks a million times better. – Matalan Store Manager, Grimsby
LED Lighting Upgrade: Project Summary & Key Insights
-
Project Scope and Objectives:
Airis partnered with Matalan to deliver a nationwide LED lighting upgrade, installing approximately 40,000 energy-efficient fittings across 127 stores.
Spanning 9 months, the project followed a structured, multi-phase approach—from inception to evaluation—designed to minimise disruption, reduce energy consumption, and improve the in-store experience for customers.
-
Collaboration and Teamwork:
This large-scale transformation was made possible through seamless collaboration between Airis, Matalan’s operations team, and cross-functional experts—including engineers, lighting designers, administrators, and logistics personnel.
Regular progress updates and coordinated efforts across departments ensured everyone remained aligned on objectives, timelines, and project milestones.
-
Delivery and Execution:
To ensure timely and efficient delivery, an average of 4 teams per week, totalling around 25 personnel, were deployed across the UK.
Over the course of the project, an estimated 400 shifts were completed. Careful planning, resource allocation, and ongoing communication enabled a smooth rollout across all sites with minimal impact on day-to-day store operations.
-
Overcoming Challenges:
Throughout the project, several challenges were encountered and successfully managed. Early supply chain delays affected the availability of shop floor fittings, prompting the team to adapt by prioritising back-of-house installations in the first four weeks.
Additionally, to respect Matalan’s request to avoid using skips on-site, a dedicated logistics team was established to collect and manage waste nationally.
These proactive solutions highlighted the team’s flexibility and problem-solving ability—ensuring the project stayed on schedule and delivered measurable, long-term benefits.
Why choose Airis?
Airis Energy Solutions UK are part of a global electronics network with HQs in 18 different countries and representation in a further 22.
We’re an end to end manufacturer, suppplier and installer, who continually research and develop our products to offer the latest and best technology on the market.
Our size means we have the capacity to handle any project, large or small.
Other LED Lighting Case Studies
Reducing Carbon, Enhancing Light: LED Retrofit at Leys Pool and Leisure Centre
In partnership with Serco, this project reduced energy consumption and enhanced lighting by replacing outdated fluorescent high bays with efficient 150W LED units — improving visibility, cutting carbon, and lowering costs in line with the client’s sustainability goals.

Lilleshall National Sports Centre: Precision Lighting for Peak Performance
In partnership with Serco, we upgraded the lighting at Lilleshall National Sports Centre, covering the Squash Courts, Table Tennis Centre, and Sports Hall. Completed in just six nights, the project met UK sports lighting standards and now provides significant energy savings with smart LED technology.

Optimising Pool Lighting: A Sustainable Upgrade at Jason Kenny Leisure Centre
In partnership with Serco, we transformed the swimming pool lighting in just 4 nights! Replacing 32 outdated floodlights with 22 energy-efficient LEDs, we achieved optimal lighting while making a significant impact on energy savings and carbon reduction.

Get in touch
If you wish to talk us directly, you can find our details here. Please note our phones are only answered during standard office hours.
Phone:
01253 283050
Email:
info@airisuk.com
Address:
Unit 2, Peal House, Poulton Industrial Estate, Cocker Avenue, Poulton-le-Fylde, Lancashire, FY6 8JU