Blackpool Victoria Hospital Corridors Benefit from Energy Efficient LED Lighting

New energy efficient LED lighting with smart sensor technology helps the hospital save the annual equivalent of the emissions generated by 1,535 ambulance call outs.

Overview

Airis were chosen to upgrade the corridor lighting across three floors in Blackpool Victoria Hospital. The original lighting was inefficient 5ft T8 fluorescents twin fixtures with self-contained emergency lighting every second fixture.

The replacement luminaires had to be specialist due to the static fixture locations seen in the before and after imagery shown below.

Energy / carbon reductions were a key driver, along with health and safety.

Energy efficient luminaires

The Airis LP240C was chosen for this project due to its built in smart sensor technology and effective light distribution. The ability to fully programme the power consumption, motion detection and daylight harvesting sensors mean the hospital can have the lighting on at all times for health and safety, whilst reducing consumption down to a chosen percentage with no occupancy. This gave further carbon savings outlined below.

70% energy output reduction

£20,500

136,666 kwh

48 tonnes carbon emissions

Usage Chart
Usage Chart

Payment Options

Airis offered a five year fully maintained zero capital expenditure solution for the project with energy savings over achieving monthly payments.

However due to government grant funding becoming available mid project, the client chose to outright purchase.

All corridor lighting is now cleaner, brighter and energy efficient. Providing patients, staff and visitors with a safer, more pleasant route through the hospital. All whilst offering carbon reduction savings, helping the environment on its journey to reversing climate change.
Damien Fryer, Airis Energy Solutions UK

Conclusion

This project alone has reduced CO2 emissions annually by 48,046kg of CO2 – the equivalent of the emissions generated by 1,535 ambulance call outs!

Call our team to find out how we can help you reduce your carbon footprint on 01253 283050.

Other LED Lighting Case Studies

LED Lighting

New Aircraft Maintenance Hangar Lit with Low Energy LEDs

Bright, clean and crisp LED lighting provides workforce with a great working environment for complex engineering and mechanical work in this new purpose-built aircraft maintenance hangar.

All areas of the hangar are well lit by the LED high bays
LED Lighting

Chiltern Reduce Energy Costs by 70%

LED lighting in their workshop and elsewhere helps precision engineers and manufacturers achieve 79% energy savings.

Chiltern Rail
LED Lighting

Improved LED Lighting Offers Carbon Reduction Savings for Timber Group

Complete refit for first of many National Timber Group sites, offering significant carbon reduction savings from new LED lighting solutions to all areas.

Rembrand Timber Ltd
Testimonial Fairhaven Golf Club

Following several recommendations, we engaged with Airis to deliver a solar project here at Fairhaven Golf Club. As an organisation, we prioritise sustainability throughout our working practices and to partner with a company that shared these values was most beneficial to the process. The project will see our annual grid consumption reduce by over 12% resulting in around 21,000 kWh of energy each year being generated. During the planning stages, we encountered several issues which the team at Airis helped to resolve. Their understanding, flexibility and practice applications made the whole process seamless. We could not recommend Airis more highly.

Mark Duncalf, Fairhaven Golf Club
Testimonial Cairngorm Capital, London

The change to LED has been a switch we’ve been considering for a few years. It was just a matter of finding the right partner with the expertise to deliver it across all our sites. Airis Energy Solutions not only made it happen, but they upgraded 29 of our sites simultaneously with upfront costs kept to a bare minimum. The results speak for themselves.

John Douglas, Cairngorm Capital, London
Testimonial Hambleton Primary Academy, Over Wyre

We sourced Airis Energy Solutions alongside the Green Business Fund / Carbon Trust to install a full school LED Smart Lighting system. All our lighting was extremely outdated and was failing more frequently, at a significant cost each time. There is no capital outlay and the installation of new lights was a very efficient process, with all the old lighting being taken off-site afterwards. It has significantly improved the appearance around school, has reduced our maintenance costs to zero, reduced our CO2 emissions and will reduce our energy consumption over time.

Head, Hambleton Primary Academy, Over Wyre
Testimonial Lostock Hall Academy, Preston

To the Airis team. Just to let you know that we’re really happy with the work and the difference in the quality of the lighting. Your guys were a credit to you with their work ethic, getting so much done at night and also over weekends. I am more than happy to recommend your services in the future.

Gary Tiller, Lostock Hall Academy, Preston
Testimonial RAP Spiderweb LTD, Manchester

From start to finish Dave and his colleagues were fantastic to deal with. Very straight forward and completely transparent about the service. We are extremely pleased with the outcome and would happily recommend Airis to anyone who is interested. We had no disruption to our very busy factory and the fitters could not do enough. All in all, an excellent job!

James Tattum, RAP Spiderweb LTD, Manchester
Testimonial McDonald's

As a business owner, I’m always trying to save money. It wasn’t until I worked with Airis Energy Solutions that I realised just how much money I was needlessly spending on energy. Thank-you.

Christian Sandoval, McDonald's Owner Operator
Testimonial Athertons Carpets, Blackpool

I would be more than happy to recommend the Airis scheme and service. We have had all our lighting replaced with the Airis scheme, with this we have had no outlay or cost to ourselves.We are delighted with the results and would therefore recommend Airis to other businesses like ourselves.

Clark Shaw, Athertons Carpets, Blackpool
Testimonial Chiltern Railways, London Marylebone Railway Station

This is fantastic. Well done to everyone especially Andy S, Kathy, Chris, Paul and the Airis team on the ground. You have all worked really hard to get the lights in and I am conscious that you have worked across the Easter weekend to get this done, thank you I appreciate this. There has been minimal disruption to our customers and our teams. Great work really pleased with the results!

Debbie Osbourne, Chiltern Railways, London Marylebone Railway Station
Contact Us:

Get in touch

If you wish to talk us directly, you can find our details here. Please note our phones are only answered during standard office hours.

Address:
Unit 2, Peal House, Poulton Industrial Estate, Cocker Avenue, Poulton-le-Fylde, Lancashire, FY6 8JU