Maximising Roof Space for Sustainability at Boughton Engineering

Boughton Engineering in Wolverhampton maximised roof space for solar energy, installing two PV arrays in just two weeks. Overcoming challenges, this project underscores their commitment to sustainability and emissions reduction.

Solar PV Installation Video

Discover the installation of Boughton Engineering's solar panels as we transform their roof space into a sustainable energy source.

Project Impact: Key Metrics

Solar Panel Capacity (kW): 88.3 kWp

System Payback: 4.8 years

Grid Independence: 22%

Carbon Footprint Reduction: 19.7 tonnes per year

Solar Energy Solutions: Project Detail Summary

  • Overview of the Project: Bought engineering were looking to maximise the roofspace for solar generation.
  • Sustainability Goals: Aiming to reduce their carbon footprint for themselves and also client driven as part of Scope 3 emmission reduction.
  • Challenges to Overcome: The site was served by 2no incoming electrical supplies creating a design challenge with only 1 roof suitable for the installation. The team had to overcome a PME bonding issue, this was completed utilising underground trenching feeding the 2nd supply in a separate building.
  • Project Duration:  2 weeks.
  • System Type: 2no Solar PV arrays.
  • Panels Utilised: 175no JA Solar 505w.
  • Inverters Utilised: 1no 50kw Solis + 1no 30kw Solis.
  • Mounting Systems Utilised Esdec ClickFit EVO mounting profile.

Why choose Airis?

Airis Energy Solutions UK are part of a global electronics network with HQs in 18 different countries and representation in a further 22.

We’re an end to end manufacturer, suppplier and installer, who continually research and develop our products to offer the latest and best technology on the market.

Our size means we have the capacity to handle any project, large or small.

Other Solar Panels Case Studies

Solar Panels

Future-Proofing Farnworth Leisure Centre with Solar PV & Mansafe Solutions

Airis, in partnership with Serco Leisure Group, installed a Solar PV array and Mansafe system at Farnworth Leisure Centre, reducing carbon emissions by 16.3 tonnes CO₂e annually and supporting Net Zero goals with easy future maintenance.

Solar Panels

Powering Sustainability at Persimmon Homes’ Lancaster HQ

Airis helped Persimmon Homes cut energy costs by 31% installing a Solar PV system and five EV chargers to support their Net Zero goals and electric vehicle fleet—delivered efficiently despite site challenges.

Solar Panels

Bell’s Healthcare Achieves Non-Penetrative Mounting Solution!

Bell’s Healthcare partners with Airis to install a high-performance solar PV system at their Southport facility, using our innovative non-penetrative mounting solution for seamless integration.

Testimonial Fairhaven Golf Club

Following several recommendations, we engaged with Airis to deliver a solar project here at Fairhaven Golf Club. As an organisation, we prioritise sustainability throughout our working practices and to partner with a company that shared these values was most beneficial to the process. The project will see our annual grid consumption reduce by over 12% resulting in around 21,000 kWh of energy each year being generated. During the planning stages, we encountered several issues which the team at Airis helped to resolve. Their understanding, flexibility and practice applications made the whole process seamless. We could not recommend Airis more highly.

Mark Duncalf, Fairhaven Golf Club
Testimonial Cairngorm Capital, London

The change to LED has been a switch we’ve been considering for a few years. It was just a matter of finding the right partner with the expertise to deliver it across all our sites. Airis Energy Solutions not only made it happen, but they upgraded 29 of our sites simultaneously with upfront costs kept to a bare minimum. The results speak for themselves.

John Douglas, Cairngorm Capital, London
Testimonial Hambleton Primary Academy, Over Wyre

We sourced Airis Energy Solutions alongside the Green Business Fund / Carbon Trust to install a full school LED Smart Lighting system. All our lighting was extremely outdated and was failing more frequently, at a significant cost each time. There is no capital outlay and the installation of new lights was a very efficient process, with all the old lighting being taken off-site afterwards. It has significantly improved the appearance around school, has reduced our maintenance costs to zero, reduced our CO2 emissions and will reduce our energy consumption over time.

Head, Hambleton Primary Academy, Over Wyre
Testimonial Lostock Hall Academy, Preston

To the Airis team. Just to let you know that we’re really happy with the work and the difference in the quality of the lighting. Your guys were a credit to you with their work ethic, getting so much done at night and also over weekends. I am more than happy to recommend your services in the future.

Gary Tiller, Lostock Hall Academy, Preston
Testimonial RAP Spiderweb LTD, Manchester

From start to finish Dave and his colleagues were fantastic to deal with. Very straight forward and completely transparent about the service. We are extremely pleased with the outcome and would happily recommend Airis to anyone who is interested. We had no disruption to our very busy factory and the fitters could not do enough. All in all, an excellent job!

James Tattum, RAP Spiderweb LTD, Manchester
Testimonial McDonald's

As a business owner, I’m always trying to save money. It wasn’t until I worked with Airis Energy Solutions that I realised just how much money I was needlessly spending on energy. Thank-you.

Christian Sandoval, McDonald's Owner Operator
Testimonial Athertons Carpets, Blackpool

I would be more than happy to recommend the Airis scheme and service. We have had all our lighting replaced with the Airis scheme, with this we have had no outlay or cost to ourselves.We are delighted with the results and would therefore recommend Airis to other businesses like ourselves.

Clark Shaw, Athertons Carpets, Blackpool
Testimonial Chiltern Railways, London Marylebone Railway Station

This is fantastic. Well done to everyone especially Andy S, Kathy, Chris, Paul and the Airis team on the ground. You have all worked really hard to get the lights in and I am conscious that you have worked across the Easter weekend to get this done, thank you I appreciate this. There has been minimal disruption to our customers and our teams. Great work really pleased with the results!

Debbie Osbourne, Chiltern Railways, London Marylebone Railway Station
Contact Us:

Get in touch

If you wish to talk us directly, you can find our details here. Please note our phones are only answered during standard office hours.

Address:
Unit 2, Peal House, Poulton Industrial Estate, Cocker Avenue, Poulton-le-Fylde, Lancashire, FY6 8JU